Underground Cable Line To Ground Short Circuit Fault Detector
Description
The main objective is to find the fault of underground cable as well as the location of the fault. Also we designed system to give alert to staff via SMS about the fault timely and protecting the system through relays. By doing this we can save a lot of time and money.
Details
In the recent times we have been exposed to the technological advancement. To meet our demand and to
make our structures urban, refined and sophisticated we replaced overhead transmission system with underground.
Overhead cables create a lot of mess they require certain safety measures, precautions and protocols. Sometimes
they are too much fatal that they cause severe accidents resulting in loss of life and properties. They also require
timely maintenance. But the underground cables don’t. They are not affected by harsh weather conditions such as
storm, snow, heavy rainfall and pollution. Besides many advantages it has many troubles and one of which is that
it is very difficult to locate a fault when occurs. On the other hand it is very easy to detect, locate and diagnose a
fault in overhead cable, but it is not possible in underground system. Wires in underground transmission system
are buried deep in land and not easily accessible. Even if we find a fault it is very difficult to detect exact location.
So we have to dig the entire area which is very costly and unfeasible. We will try to find the exact location of fault.
In this paper we will discuss how we could locate a fault when we are using scheme of underground transmission
system. We know a wire as a whole act as resistance it draws a specific current and has a potential drop. When line
to ground fault occurs there is a change in resistance so potential drop and current drawn. We are observing these
changes via ADC converter of control system. Monitoring these changes we detect the location at which our wire
is exposed towards a fault. In this paper we will discuss how to send exact location of fault to field stations which
alerts the field workers.
Working of this project is divided into four parts – DC power supply Part, Transmission wires, Control Unit,
Fault Display and Communication .
We provide the supply of 230v AC then it is step down using transformer, bridge rectifier converts ac signal to dc
signal . This is supplied to our control Unit Because Devices there does not support high voltage. The series of
resistors will work as like cable.
The set of switches are used as fault creators to create the fault at each location. The change in current is sensed
by monitoring system.
Firstly we will Calculate Supply voltage coming from step down transformer and show it on LCD Display.
We have connected these phase lines to voltage monitoring system which is continuously monitoring system volt-age change. Controlling part uses the analog to digital (ADC) to converter the input voltage signal from the
transmission wires to the digital signal for the Microcontroller. The microcontroller makes calculations for the
distance of the fault. The relay is powered by the microcontroller and it trips the load in case of fault.
As we know a wire has a specific resistance we have make a prototype with resistors. When a fault occurs resistance
of wire would change accordingly and it would change voltage parameters which we are monitoring at the
start through voltage monitoring system. The system detect fault. In this case resistors having some resistance will
work like transmission lines. Whenever a fault is created a specific voltage dropped as per the resistor network
combination. The voltage is sensed by microcontroller and the distance to which that voltage correspond updated
to the authority . When a specific voltage drop occur then it will be feed to ADC of ardiuno which will calculate
the fault distance. We are using GSM in our project it will convey the fault detail to authorities in very less time.
Display part consists of the LCD display interfaced to the microcontroller and it shows voltage of each cable and
the fault distance of the cable.
Gallery
More from Electrical & Computer Engineering
Deep-PI-Car
The project, which is Deep-Pi-Car, is an autonomous prototype car that performs multiple tasks like Lane navig…
Supervisor: Taimour Taj Shami
Parallel Operation Of Wind And Battery To Operate Constant Load
we are going to operate a constant load by using two different sources .
Supervisor: Muhammad Hamza Tahir
Smart Energy Metering System
We made an IoT system for consumption of monitoring energy, which give us all the electric parameters like cur…
Supervisor: Sajjad Ali Shah
Agricultural Water Controlled System Using IoT
Our project ( Agricultural water controller ) is based on IoT ( Internet of Things ). In this project we are u…
Supervisor: Sheikh Hassan Javaid